For Industrial Customers

Switch from Diesel to Piped Natural Gas

If your facility runs on diesel generators, you are paying a premium for every kilowatt hour you produce. Piped natural gas delivers the same power at a fraction of the fuel cost, with none of the logistics.

The Cost Case

What switching typically saves

For a facility running diesel generators through a standard working month, switching to piped natural gas typically reduces fuel costs by 40 to 55 percent, depending on the exchange rate. Because the savings are large relative to the equipment cost, the investment in gas-fired generation, whether a new gas generator or a bi-fuel conversion of your existing units, is usually recovered within months.

We prepare a site-specific analysis for every prospective customer, based on your verified fuel records, before you commit to anything.

40-55%typical fuel cost saving versus diesel
< 1 yeartypical payback on gas-fired equipment
Meteredbilled in arrears on what you consume

Estimate your indicative monthly saving

Enter your figures below for an indicative estimate only. It is not a quote.

Prefilled with a typical current pump price. Edit it to match your own supplier.
Indicative monthly saving to

About to a year

Current monthly diesel spend:

Indicative only, based on a 40 to 55 percent fuel cost saving. Complete the Energy Data Form for a site-specific assessment.
Beyond the Fuel Bill

Operational benefits of piped gas

Continuous supply

No tanker deliveries, no fuel scarcity, no road risk. Gas flows through a dedicated pipeline to your gate.

Zero pilferage

Supply is metered and tamper proof. What you are billed is what your equipment burned.

Lower maintenance

Natural gas burns clean, extending engine life and reducing servicing frequency.

No storage infrastructure

No diesel tanks, bund walls or storage compliance costs.

Better working capital

Gas is billed in arrears on metered consumption. No advance fuel purchases.

Cleaner operations

Significantly lower greenhouse gas, particulate and NOx emissions, supporting your ESG and regulatory obligations.

Leaner operations

No staff tied up in fuel decanting, storage monitoring and quality testing.

What We Install

Infrastructure to your gate

Gasland Horizon builds and operates everything needed to bring gas to your facility:

  • A spur line from the distribution network to your premises
  • A Pressure Regulation and Metering Station (PRMS) at your gate
  • Guidance on internal piping and on gas generator procurement or bi-fuel conversion of existing units
The Process

From enquiry to first gas

  1. Complete the Energy Data Form
  2. Receive your preliminary savings assessment
  3. Site assessment by our technical team
  4. Execute a Gas Sale and Purchase Agreement with the JV
  5. Connection works and commissioning
  6. Metered supply begins

Ready to cut your energy costs?

Complete the Energy Data Form or call +234 802 292 2952.